According to the schedule,
the first train will start at 7 am from Kalka and reach Koti at 7.55 am. It will return at 8.20 am and reach Kalka by 9.15 am. 04506/07
The second train will start from Kalka at 3 pm and return at 4.20 pm. 04516/17
tickets are unreserved.
Two special trains were started on the Kalka-Koti stretch of the UNESCO World Heritage Kalka-Shimla narrow gauge rail line today.
A successful trial of the two trains was held yesterday. The Kalka-Shimla rail line had suffered damage at several places due to heavy rain during the last two months, resulting in operations being suspended. Work is underway to repair a 50m bridge near Summer Hill which was damaged in a landslide on August 24.
entire operation to be resumed by 1st.oct
#indianrailways #railfans #indianrailways #railfanning #trending #trains #toytrain #viral #himachal #g20
part2
• EP2 kalka Shimla Railway Phase1 trial...
• EP3 | kalka Shimla railway Phase2 Ope...
plz support me by subscribing